PROJECT

2018

ASSET

Tropicana Gold Mine

WORK

Legeneering was approached by AngloGold Ashanti to fabricate a new pipe bridge for their Ball Mill project at the Tropicana Gold Mine in Western Australia.

  • Fabrication
  • Dimensional Verification
  • Full Abrasive Blast
  • 3 coat paint system

This job was delivered on time with zero safety incidents.

Connect With Us