PROJECT

2017 – 2018

ASSET

Darwin LNG Wharf

WORK

Legeneering was tasked at applying protective coatings consisting of STOPAQ and paint to the underside of the Loading Berth at the Darwin LNG wharf to increase operational lifespan and protect against corrosion.

STOPAQ was identified as the best solution for life expansion, as it carries a 30 year guarantee.

  • Surveying
  • Scaffolding Design
  • Scaffolding
  • Blast and Painting
  • STOPAQ application