Legeneering was approached by AngloGold Ashanti to fab a new pipe bridge for their Ball Mill project at the Tropicana Gold Mine in WA. We successfully secured the tender for the construction, fabrication, blasting, painting and testing of the pipe bridge portion of the mill.
Despite the high-pressure deadline, we delivered on time to the client with zero safety incidents over the seven-week project period.
“You’ve outshone everyone else” – client feedback
The pipe bridge is 33m long, 9m high and 3.5m wide and consisted of over 30 Tonne of structural steel. The bridge had a full abrasive blast and a three coat protective paint system. Legeneering additionally completed Dimensional Verification of each component via our unique processes to ensure a perfect fit onsite.